Process
One accountable team, from brief to measured handover.
Most facility programmes lose time at the seams — between design and MEP, between MEP and cleanroom, between handover and validation. Ambergo holds those seams.
01
Plan
Feasibility, DPR and functional planning.
02
Engineer
HVAC, classification, flow and utilities.
03
Build
Cleanroom systems, interiors and MEP.
04
Prove
Commissioning, validation data and O&M.
Brief and site survey
Requirements captured on site, against the existing constraints rather than an ideal plan.
Concept, feasibility and DPR
Techno-commercial feasibility, Detailed Project Report and business plan validation.
Design and engineering
Functional planning, classification strategy, MEP and utility engineering, 3D visualisation.
Procurement and manufacture
Panel systems, furniture, flooring and instrumentation specified with published test data.
Execution and site supervision
Self-performed interior and cleanroom execution with our own supervision and QA.
Commissioning, QA and handover
Snagging, commissioning, validation-ready documentation and operational handover.
Retained O&M and calibration contracts continue after handover.