Process

One accountable team, from brief to measured handover.

Most facility programmes lose time at the seams — between design and MEP, between MEP and cleanroom, between handover and validation. Ambergo holds those seams.

  1. 01

    Plan

    Feasibility, DPR and functional planning.

  2. 02

    Engineer

    HVAC, classification, flow and utilities.

  3. 03

    Build

    Cleanroom systems, interiors and MEP.

  4. 04

    Prove

    Commissioning, validation data and O&M.

01

Brief and site survey

Requirements captured on site, against the existing constraints rather than an ideal plan.

02

Concept, feasibility and DPR

Techno-commercial feasibility, Detailed Project Report and business plan validation.

03

Design and engineering

Functional planning, classification strategy, MEP and utility engineering, 3D visualisation.

04

Procurement and manufacture

Panel systems, furniture, flooring and instrumentation specified with published test data.

05

Execution and site supervision

Self-performed interior and cleanroom execution with our own supervision and QA.

06

Commissioning, QA and handover

Snagging, commissioning, validation-ready documentation and operational handover.

Retained O&M and calibration contracts continue after handover.